1911-11-03
Folder 27
GUSN-260148
A view of workers laying the tracks on the Longfellow Bridge, looking toward the West End and Beacon Hill. Horse carts carry loads to and from Boston across the bridge. The workers, with their full wheelbarrows and shovels, can be seen in the foreground. Massachusetts General Hospital is in the upper left corner. The Longfellow Bridge was completed for street traffic in 1906, six years before any train would cross it. The workers here are seen finishing up the tracks in November 1911, just a few months before the opening of Boston's Red Line subway.
The Red Line turned 100 years old on March 23, 2012. When the line opened in 1912, it was called the Cambridge Main Street Subway. The line went from Park Street Station to Harvard Square in just eight minutes. It is estimated that 204,000 people rode the new subway on its first day.
subways
tracks (transit system elements)
bridges (built works)
rivers
hospitals (buildings for health facility)
horse-drawn vehicles
workers
shovels
wheelbarrows
photographs
black-and-white photographs
1 black and white photograph
PC017
Boston Transit Archive, 1895-1960s
PC017.02.027.001
7.75 x 9.75 (HxW)(inches)
Boston (Suffolk county, Massachusetts)
Charles (Massachusetts) [river]
photographs
black-and-white photographs
West End (Boston, Mass.)
Item
Folder 27
Historic New England is committed to implementing reparative language description for existing collections and creating respectful and inclusive language description for new collections. If you encounter language in Historic England's Collections Access Portal that is harmful or offensive, or you find materials that would benefit from a content warning, please contact [email protected].